File Name: Pre_Task_Plan_2010_10-1.pdf
File Size: 169.40 KB
File Type: Application/pdf
Last Modified: 3 years
Status: Available
Last checked: 2 days ago!
This Document Has Been Certified by a Professional
100% customizable
Language: English
We recommend downloading this file onto your computer
Date Plan Prepared Job Name: Job Number: Job Location: PRE-TASK PLAN Company Name: Author/Planner: Location of Work: Task to be accomplished: Start Date/Time: End Date/Time: Crew Size: Housekeeping Plan (Trash removal, Clean up, responsible person, frequency): Material Storage & Handling Plan (Deliveries, Laydown, Equipment): Access & Hoisting Plan (Personnel & Materials): Please consider the work to be performed and check ‘Yes’ or ‘No’ (attach additional information as needed): 1 Does every crew member know how to use 9 Is there any potential to impact existing Yes No Yes No assigned tools & equipment? Owner or Construction activity? 2 Does this work require special training? Yes No 10 Are there occupied spaces adjacent or below? Yes No 3 Do you need additional or special personnel 11 Have shop drawings, contract drawings, and Yes No Yes No to complete this task? as-builts been reviewed? 4 Do you need additional or special materials 12 Will there be any discharge of fluids? Yes No Yes No and tools to do the job? 13 Do other subs need to be involved? Yes No 5 Do you need to review an MSDS to proceed 14 Does this task require any special Yes No Yes No with this work? permits/procedures? 6 Is there adequate lighting and access? Yes No 15 Employees are assigned a “buddy”? Yes No 7 Will weather conditions affect the safety or 16 Crew knows location of fire extinguishers, eye Yes No Yes No quality of this work? washes, phones? 8 Does this task require shutdown of systems 17 Work involves awkward positions, heavy or Yes No Yes No or equipment? repetitive lifting? Check if any of the following apply (attach additional information as needed): Public Interface Confined Space Electrical Hazards Critical Lift Plan Fall Protection PPE Respirator PPE Traffic Control Chemical Exposure Lock-Out/Tag-Out MSDS/HazCom Hand/Arm PPE Hearing PPE Barricades/Signs Ventilation Open Flame Welding Full Body PPE Eye/Face PPE Construction Activity (In Sequence) Hazards Identified Preparation (NOTE: Attach supplemental information as needed) This is Page 1 of
The tasks have been reviewed in the work area where they will be performed and this plan has been reviewed with the workers on this crew
Foreman Signature: Reviewed by: Phone/Pager: Crew Sign In:IF WORK CONDITIONS CHANGE, WORK MUST STOP AND A NEW PLAN MUST BE PREPARED
Hoffman Construction Rev. 10/10
Hoffman Construction Rev. 10/10 Date Plan Prepared Job Name: Job Number: Job Location: PRE-TASK PLAN Company Name: Author/Planner: Location of Work: Task to be …
How a Task Pre-Plan Works. As the name implies, pre-task planning meetings are held immediately prior to performing a specific task. Since tasks will vary in duration, it is possible for a team to have only one pre-task planning meeting on one day but to have four or five such meetings on another day.
Pre-task Planning (STA) is a great way to focus your team. The STA is a living document that helps everyone to focus on their tasks for the day. Here are a few things to keep in mind when using this tool: Identify other trades working around you and ask the question “Can I safely work around them?”
Pre Task Safety Planning. As the name implies, pre-task planning meetings are held immediately prior to performing a specific task. Since tasks will vary in duration, it is possible for a team to have only one pre-task planning meeting on one day but to have four or five such meetings on another day.